Interior framing comes before insulation, vapour barrier, and drywall, so its timing and accuracy shape every stage after it. Performance works with your site team to confirm the project requirements and timing before framing begins.
Reviewing the scope ahead of time lets us clarify what is included, flag any information we still need, and plan our work around the trades already on site.
Non-load-bearing steel stud framing for walls, bulkheads, and ceilings, built to the plans and ready for board. Stud sizes and layout follow your plans and specifications and are confirmed in your quote before work starts.
Performance manages your framing scope from quote review to handoff, so you have one point of contact from framing through insulation and drywall.
We confirm the available project information and timing with your team before the crew arrives.
We plan framing around the agreed project sequence and coordinate with the appropriate site contact.


Performance provides steel stud framing where the plans call for it. Each scope is reviewed against the building, available plans, site conditions, and required schedule.

Non-load-bearing walls, bulkheads, and ceilings framed in sequence with the rest of the interior work.

Steel stud framing as part of an addition, renovation, or interior fit-out.

Framing for bulkheads, soffits, and ceilings so ducts, lighting, and finishes have a clean, level structure to work from.
Provide a few key details about your project, and our team will review the framing requirements and follow up about the next steps.


Send us your available plans, project details, and preferred schedule.
We review the requirements with your team, clarify the work included, and coordinate the proposed start date.
Our crew arrives at the agreed stage of construction and completes the approved steel stud framing.
After framing, we review the completed work against the agreed project requirements so the space is ready for board. Any photographs or documentation included in the scope are provided to the designated site contact.


Steel stud framing builds non-load-bearing interior walls, bulkheads, and ceilings. It creates the structure that insulation and drywall attach to.
Our steel stud framing service covers non-load-bearing walls, bulkheads, and ceilings. If your project includes structural framing, include those details in your quote request and we will confirm what is in scope.
Yes, when those services are included in the approved scope. Performance can coordinate steel stud framing with insulation, vapour barrier, drywall, and taping, so the space moves from framing to paint-ready with one team.
Send your plans and specifications, building type, approximate wall and ceiling areas, bulkheads or other details to frame, whether insulation and drywall are also needed, project location, preferred start date, and access information. Include the site scheduling contact if you have one.
It depends on the building design, progress of the surrounding trades, and the overall construction schedule. Share your proposed date with the quote and we will coordinate with your site contact.
Our team reviews the information provided and determines whether any additional details are needed to define the scope. We will then follow up to discuss the project requirements, proposed schedule, and next steps for preparing a quote.